Snagging a New Build House: What You Need to Know
“Snagging” is identifying the faults and unfinished work in a new-build home — from poor paintwork and mis-aligned doors to plumbing and structural defects. You should commission a professional snagging survey before or soon after completion, report snags to the developer in writing, and rely on your NHBC (or equivalent) warranty. Unresolved snags can also affect reselling a new build.
What is your property worth?
Get genuine offers from checked & vetted buyers.
- Discloseany issues
- Priceto the real market
- 7-28 dayscash, as-is
Snagging means finding and listing the faults, unfinished jobs and cosmetic defects in a new-build home so the builder puts them right. Do it before you complete if you can, and certainly within your first weeks of moving in. Hire an independent snagging inspector (typically a few hundred pounds, more for large homes), give the builder a dated written list, and keep chasing in writing. For two years the builder is responsible for putting defects right; after that, structural cover usually passes to the 10-year warranty. And if you are selling a new build, an unresolved snag list is the quickest way to lose a buyer.
- 2 yearstypical builder defects period under the New Homes Quality Code
- 10 yearsstandard structural warranty (NHBC, LABC, Premier and others)
- 1 in 4agreed sales that fall through before exchange
- 16–24 weekstypical open-market sale, listing to completion
- "Snag" covers everything from a chipped worktop to a bath that does not drain. Most are small. A few, such as missing cavity trays, poor insulation or failed fire stopping, are serious and are not visible to the untrained eye.
- An independent inspector works for you. The builder's own site manager and the warranty surveyor do not, however pleasant they are.
- Written, dated and photographed lists win disputes. Phone calls and chats on the doorstep do not.
- Do not withhold the whole purchase price because of snags. Your solicitor can sometimes agree a modest retention for specific outstanding items, but refusing to complete without agreement can put you in breach of contract.
- If you plan to sell a new build in the first two years, your warranty and your open snag list travel with the house. Sort them first or price them in.
- If a sale is urgent and the house has genuine defects, a cash buyer who will take the property as it stands is a legitimate route, at a discount.
What snagging actually is
Every new home has faults. Builders know it, and the industry has a word for it: snags. They are not necessarily signs of a bad developer. A house is built by dozens of trades working to a programme, often to a sales deadline, and things get missed. The question is how many, how serious, and how well the builder deals with them.
Snags fall into three broad groups, and it helps to think of them that way.
Cosmetic snags
Paint splashes on glass, scratched worktops, gaps in sealant, crooked tiles, doors that catch on the frame, loose sockets, uneven grout lines. Annoying, but fixable in a day. You will find most of them yourself with a torch and a free afternoon.
Functional snags
Windows that do not lock, extractor fans that vent into the loft rather than outside, a shower that leaks onto the ceiling below, radiators that never get hot, a boiler that trips the circuit, an external tap that does not shut off. These affect how the house works. They need a fix within days, not weeks.
Defects with structural, safety or compliance implications
Missing or badly fitted cavity barriers, incomplete fire stopping between party walls, missing insulation, wrongly installed lintels, damp from a faulty damp-proof course, drainage laid to the wrong fall, cracks that open and close. Many of these are hidden behind plasterboard by the time you see the house. They are the reason the inspection of work in progress by Building Control matters, and why you should be wary of a builder who says "it all passed inspection, so it will be fine." Inspections sample the work. They do not guarantee every metre of it.
Who is responsible, and for how long?
This is where most buyers get confused, so let us lay it out plainly.
| Period | Who puts it right | What it covers |
|---|---|---|
| Before legal completion | The builder, as part of finishing the home | Everything you spot at your pre-completion inspection and snagging visits |
| Years 1 and 2 (the defects or "customer care" period) | The builder, with the warranty provider and the New Homes Quality Code as backstop | Defects arising from poor workmanship or materials, including most snags that appear after you move in |
| Years 3 to 10 | The warranty provider (for example NHBC Buildmark, LABC Warranty or Premier Guarantee) | Defined structural and major defects. Not cosmetic or general wear and tear |
| Beyond | Legal claims, such as under the Defective Premises Act 1972, as extended by the Building Safety Act 2022 | Unfit work. Longer limitation periods apply to certain dwellings and works, but these are complex claims requiring a specialist solicitor |
A few details are worth knowing.
The New Homes Quality Code, run by the New Homes Quality Board and in force since 2022, replaced the old Consumer Code for Home Builders. Builders who register commit to treating buyers fairly, providing clear information before you reserve, and dealing with defects within the first two years in a reasonable timeframe. The Code is enforced through the New Homes Ombudsman Service, which you can complain to if the builder does not resolve your problem. The government has said it intends to put the Ombudsman on a statutory footing, so check the current position when you make a complaint; rules in this area are changing.
The 10-year warranty is not a catch-all. It will usually cover structural problems and certain major failures, but it explicitly excludes cosmetic items, normal settlement and minor cracking. The cover is also usually a "builder first" model for the first two years: the warranty provider expects you to go through the builder, and steps in to resolve unaddressed defects.
The Defective Premises Act 1972 imposes a duty to do work in a workmanlike or professional manner with proper materials so the dwelling is fit for habitation. The Building Safety Act 2022 extended the time for bringing claims substantially for certain building work, including retrospective periods for earlier work. This is a specialist area and I would not rely on a general summary. If you suspect a serious problem, a property litigation solicitor is the right call.
The snagging timeline: when to inspect
People tend to think of snagging as one event. Done well, it is three.
- Pre-completion inspection. Most developers offer an appointment, typically around a week before completion, with the site manager or sales team. This is your first chance to look inside. If you have booked an independent snagger, this is the visit to bring them to. Everything on the list gets recorded and the builder gives you a date to fix it.
- Completion day. You legally take ownership and collect the keys. Check the meter readings, the keys, the manuals and warranty certificates. Do not rely on a verbal promise to fix something "next week."
- The first weeks and months. New homes dry out, settle and show faults under real use. Walls crack at joints as plaster dries, hairline cracks appear, heating systems get a proper workout, windows fog if seals fail. Keep a list and report in batches. At around month 11 many owners do a final "end of year one" inspection to catch anything before the first anniversary.
The earlier the better. Defects reported before you complete are leverage. Defects reported eight months later are a conversation about whether you caused them.
Should you pay for a professional snagging survey?
I think yes, in nearly every case, and especially on a house costing six figures. A snagging inspector spends a few hours with moisture meters, thermal cameras, spirit levels and a systematic checklist. They find things you will not, and their report carries more weight with a builder than "my husband thinks the skirting looks wonky."
Costs vary by region, size of the home and the depth of the inspection. As a guide, a small flat can be in the low hundreds of pounds and a large detached house will cost more. Get at least two quotes and ask what the report includes. Some inspectors also offer a re-inspection to check the fixes, which is often worth having.
What to look for in an inspector
- Membership of a professional body, such as RICS, CIOB or a recognised snagging association. Ask what training and indemnity insurance they have.
- Experience with new builds specifically, not just second-hand surveys.
- A sample report. You want photographs, locations and clear descriptions, not a vague list.
- Independence. They should not be recommended or paid by the developer.
What it is not: a Building Regulations sign-off, a structural survey, or a guarantee that no defects remain. It is a thorough visual and instrumented check of what can be seen and measured.
Doing your own snagging: a practical checklist
If you decide to look yourself, or you want to prepare before the inspector arrives, take a torch, a phone with a good camera, a tape measure, a marble or small ball (to test floor levels), a plug-in socket tester and some masking tape for marking defects. Work room by room, in daylight, and take your time. Two hours is not enough for a whole house.
Outside
- Brickwork: uneven pointing, cracked or chipped bricks, efflorescence (white salts), missing weep holes.
- Roof: slipped or cracked tiles, flashing around chimneys and velux windows.
- Gutters and downpipes: sagging, leaking joints, pointing the wrong way.
- Drainage: do the gullies and manholes have covers, and does water actually drain away from the house?
- Landscaping: levels that slope toward the house, patios without a fall, fences not matching the plot plan.
- Doors and windows: do they open, close and lock smoothly? Check the seals and any scratches on glazing.
Inside
- Walls and ceilings: cracks, blemishes, uneven plaster, nail pops. Hold a torch flat against the wall to show up bumps.
- Floors: squeaks, gaps, uneven levels, loose boards. Roll a marble across to detect slopes.
- Kitchens and bathrooms: run every tap and flush every loo. Check under the sink for leaks. Test for hot water at every outlet. Check silicone sealant is complete and tidy.
- Electrics: test every socket, switch and light. Check the consumer unit is labelled and smoke and heat alarms work.
- Heating: boiler commissioning certificate, thermostat operation, radiators heating evenly.
- Ventilation: extractors working and ducted outside.
- Doors: all internal doors closing without catching, with handles and latches working.
- Loft: insulation depth and coverage, access hatch seal, no gaps around pipework.
Photograph each snag, note the room and the position, and number them. Your list is a legal-style document in the making.
How to deal with the builder
Most snagging disputes are not about the defects. They are about process. The builder's customer care team is juggling hundreds of households. Make it easy for them to help you.
- Put everything in writing. Email the numbered list with photos and a reasonable deadline. Keep a copy.
- Separate urgent from routine. Water leaks, no heating, no hot water, electrical faults, security issues (doors that do not lock) are urgent. Say so in the subject line. Cosmetic items go in a general list.
- Agree access dates in writing. A snag fixed but missed because nobody was home is a delay you caused. Document it.
- Do not let them "close out" defects on your behalf. Sign off only after you have inspected the repair. A poor fix is worse than none, as it hides the original problem.
- Escalate in steps. Customer care first, then regional management, then the warranty provider or the New Homes Ombudsman Service if you have given the builder a fair chance and the Code has not been followed.
On timescales: the New Homes Quality Code expects builders to respond to defects within reasonable timeframes and to treat emergencies as such. Treat anything the builder promises as a target, record when it slips, and escalate rather than silently suffering.
Should you refuse to complete because of snags?
This is the question I hear most and the answer disappoints people. Usually, no.
When you exchange contracts you are legally committed to buy on a set date. The developer typically serves a notice to complete once the property is ready, giving you a short period to complete. If you refuse because the house has snags, you may be in breach: they can charge interest on the balance, and in the worst case, keep your deposit and resell the property. That is not a position anyone wants to be in on a £300,000 purchase.
What you can do is:
- Insist on the pre-completion inspection and have your list agreed in writing before completion.
- Ask your solicitor whether the builder will agree a retention: a small sum held back until specific items are fixed. This is a negotiation, and many large developers refuse, but some agree for substantial outstanding items.
- Refuse to complete only if the property is not substantially finished or is unsafe, for instance without a habitable bathroom or with building control sign-off missing. Take your solicitor's advice before you do this, because the line between "unfinished" and "snagged" is where disputes arise.
Check that you have the right paperwork on completion day: the Building Regulations completion certificate, gas safety and electrical certificates, the warranty certificate, an EPC and the planning conditions discharge information. A missing completion certificate is a problem, because the next buyer's solicitor will ask for it.
A worked example: what snagging costs and saves
Take a hypothetical three-bed new-build semi, bought for £320,000. The buyer pays £450 for an independent inspection. The inspector produces a 94-item report: 78 cosmetic snags, 12 functional (a leaking waste pipe under the bathroom basin, an extractor fan not connected to ducting, two windows that do not close fully and others) and four more serious items (inadequate loft insulation over part of the ceiling, a missing cavity tray above one window head, and gaps in the fire stopping to the party wall at loft level).
| Item | Illustrative cost to the buyer without a snagging report | With snagging report and builder fixing |
|---|---|---|
| Inspection fee | £0 | £450 |
| Cosmetic repairs (78 items) | Often accepted by the owner or paid for privately, perhaps £1,500 or more | £0, builder's cost |
| Functional repairs (12 items) | Several hundred to a couple of thousand pounds | £0, builder's cost |
| Hidden defects (four items) | Possibly unknown until a later survey, and potentially costly to remediate | £0, builder's cost, with evidence if disputed |
| Effect on future resale | A later buyer's surveyor may find the same issues and ask for a price reduction | Defects documented as fixed. Cleaner position |
The figures are illustrative, not quotes. The point is the asymmetry: a few hundred pounds up front protects a purchase of hundreds of thousands, and it gives you a record you can hand to a future buyer.
Selling a new build with open snags or defects
Now the angle most guides ignore. Perhaps you bought a new build and want out, because your circumstances have changed, or because the house has not lived up to the brochure. What does that do to your sale?
First, be honest with yourself about the market. A recently built home sells against new homes from the developer, who may offer incentives such as paid stamp duty, deposit contributions and flooring packages that you cannot match. Buyers in this price band often have the option of a brand new house with a full warranty. You are asking them to pay close to the same price for a house that is a year or two old. That is the real cause of the "new build premium" discussion, and it is why a resale new build can take longer than you expect.
Second, defects follow the house. The 10-year warranty generally transfers to the new owner, which is helpful. But an open snag list, a dispute with the builder or missing completion certificates will be spotted by the buyer's solicitor and surveyor. You will be asked on the TA6 whether you have had any disputes or complaints about the property. Answer truthfully.
Third, check any restrictions in the contract and the title. Some developers impose resale restrictions in the first year, or require you to use their sales team. Shared ownership and Help to Buy equity loan properties have their own rules on redemption and staircasing. Read before you list.
What I would do in practice:
- Report any outstanding defects to the builder in writing and get them fixed before you list. A "snagged and signed off" property sells better than one with a dispute attached.
- Gather all certificates and warranty documents into one folder. A missing electrical certificate delays more sales than any cosmetic fault.
- Price against comparable resales in the same development, not against the developer's current list prices.
- Get a realistic valuation and compare it with an alternative sale route if the market is slow.
When a cash sale makes sense, and when it does not
If you need to sell a defective or heavily snagged new build quickly, perhaps because of a relocation, a separation or financial pressure, a cash buyer can complete in as little as 7 to 28 days against 16 to 24 weeks for an open-market sale, and without a mortgage valuation to worry about. They buy as seen, which means unresolved snags are their problem after completion.
It suits you if you need certainty and speed, the defects are expensive or uncertain to repair, and you accept a discount. Genuine cash offers typically sit in the region of 75% to 85% of market value. Above about 82% deserves scrutiny, because it often means the offer will be reduced later.
It does not suit you if the house is basically sound, the snags are minor, and you have the time to fix them and market the property. You would be handing over tens of thousands of pounds to avoid a problem that a competent builder will fix for free under the defects period. And it is the wrong move if the defects are covered by the warranty and a claim would put the house right. Finish the claim, then sell.
If you do speak to cash buyers, check that they are members of the National Association of Property Buyers (NAPB) and registered with The Property Ombudsman (TPO). They should never charge you fees, they should show proof of funds, and they should confirm the offer in writing. Our guide to the best house-buying companies compares the main names, and our page on cash house buyers explains how the process works. If you want to see what a fast sale might look like for your own home, start with sell house fast.
Ready Steady Sell was founded by Lisa Hayes, and the advice we give is the advice she would give a friend: fix it if fixing is cheap, sell fast if time is the real problem, and never accept a figure you cannot explain.
Red flags when buying a new build
Whether you are buying or advising someone who is, these are the warning signs I take seriously.
- A builder who discourages an independent inspection. Good developers are not threatened by it.
- Pressure to reserve or exchange quickly with "the last plot at this price" language.
- Vague answers about the warranty provider or the planning conditions.
- Signs of rushed finishing: unfinished roads, temporary hoarding, poor external works.
- Reluctance to put promises in writing. Any commitment to fix, upgrade or refund should appear in an email or the contract.
- An unusually high number of snags at the first inspection. It suggests the supervision is weak.
- Missing Building Regulations certificates at completion.
Frequently asked questions
How long does a builder have to fix snags?
There is no single fixed deadline for every snag. The New Homes Quality Code expects defects to be dealt with within reasonable timeframes and emergencies promptly, and many builders set their own targets in the customer care process. Always ask for a written date for each item.
How much does a new build snagging survey cost?
Prices depend on the size of the property and the inspector, but are typically from a few hundred pounds for a flat or small house up to several hundred pounds for a large home. Get two quotes and check what is included.
Can I refuse to complete if my new build has snags?
Generally not for ordinary snags. You are bound by the contract, and refusing could lead to interest charges or loss of your deposit. Raise issues before completion, agree a written list, and ask your solicitor about a retention for substantial outstanding items. Take legal advice before withholding completion.
Does the 10-year warranty cover snags?
No. It primarily covers structural and defined major defects. During the first two years the builder is expected to deal with defects arising from poor workmanship or materials; the warranty provider generally steps in if they do not. Cosmetic issues and wear and tear are excluded.
Can I snag a new build after I have moved in?
Yes, and you should keep doing so for the first two years. Report defects in writing as soon as you spot them, and do an end-of-year-one inspection before your first anniversary.
Does the warranty transfer if I sell a new build?
Standard 10-year warranties generally pass to subsequent owners for the remaining term, which is a selling point. Confirm the terms of your own certificate.
The bottom line
Snagging is boring and it pays. Book an independent inspector, write everything down, number and photograph each fault, push for fixes in writing, and keep the paperwork tidy for whoever buys the house from you in the future. Do not complete without an agreed list. Do not assume the warranty covers a scratched worktop. And if the problem is not the snags but the clock, remember there is a legitimate fast route, provided you check the buyer properly and treat the discount as the price of speed rather than a favour. If you want a straight second opinion, call Ready Steady Sell on 0191 722 1292.
This guide is general information, not legal or surveying advice. Warranty terms, builder codes and consumer protections change; check the current position with your solicitor, your warranty provider and the New Homes Ombudsman Service.
Don’t accept a lowball offer for your home
Compare genuine cash offers and investor options in minutes — free, no obligation, no fees.

Written & reviewed by Lisa Hayes, Founder
Lisa Hayes is the founder of Ready Steady Sell and an independent UK home-selling expert with over a decade helping homeowners weigh cash house buyers, property investors and the wider fast house-sale industry — without pressure or hidden fees. Every guide is reviewed for accuracy under our editorial standards.
LinkedIn · Expert commentary · In the media · Industry statistics
Frequently asked questions
Straight answers, no sales talk
What is snagging on a new build?
It’s the process of identifying faults and unfinished work — paint, doors, plumbing, structural defects — usually via a professional snagging survey, then reporting them to the developer to fix under warranty.
Who fixes snags on a new build?
The developer, during the defect period (typically the first two years), supported by the NHBC or equivalent warranty and the New Homes Quality Code. Report snags in writing and keep records.